Technical Beneficiation Tool
Ore Tonnage & Recovery Yield Calculator
Estimate net metal recovery ounces and concentrates from geological ore reserves, head grade, and plant process efficiency across Tanzanian greenfield and brownfield deposits.
Mineral Reserves Parameters
Total dry metric tonnes (dmt) mined
90%
50% (Heap Leach)88-92% (CIL/CIP Standard)98% (Flotation/Ultra-fine)
Beneficiation Yield
Estimated Metal Output
Total In-Situ Metal
5626.38 oz t
Recovered Saleable Product (90%)
5063.74 Troy Ounces (Au)
Based on metallurgical process recovery efficiency of 90%.
